각 복사하기 버튼을 이용하여 블로그나 카페에 붙여넣기 하실 수 있습니다.
 
분야 : 공학 > 건축공학
발행기관 : 한국건축시공학회
간행물정보 : 한국건축시공학회 학술발표대회 논문집, 2012 pp.~1 (총 2pages)
 
 
영문초록
If the mechanical development be applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the re-bar yield strength and diameter. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.
 
 
고강도철근, 기계적정착, 성능평가실험, 원전구조물, High-Strength Re-Bar, Mechanical Development, Performance Evaluation Test, Nuclear Power Plant Structure
 