건축 공법과 디자인의 특이한 형태(영문)

 1  건축 공법과 디자인의 특이한 형태(영문)-1
 2  건축 공법과 디자인의 특이한 형태(영문)-2
 3  건축 공법과 디자인의 특이한 형태(영문)-3
 4  건축 공법과 디자인의 특이한 형태(영문)-4
 5  건축 공법과 디자인의 특이한 형태(영문)-5
 6  건축 공법과 디자인의 특이한 형태(영문)-6
 7  건축 공법과 디자인의 특이한 형태(영문)-7
 8  건축 공법과 디자인의 특이한 형태(영문)-8
 9  건축 공법과 디자인의 특이한 형태(영문)-9
 10  건축 공법과 디자인의 특이한 형태(영문)-10
※ 미리보기 이미지는 최대 20페이지까지만 지원합니다.
  • 분야
  • 등록일
  • 페이지/형식
  • 구매가격
  • 적립금
자료 다운로드  네이버 로그인
소개글
건축 공법과 디자인의 특이한 형태(영문)에 대한 자료입니다.
목차
1.Introduction

1.1 highrises building justice highrise building is not divided correctly according to the number of layers or height and is defined relatively according to viewpoint.
1.2 researches purpose and sense & recently the tendency

2. Main discourse
2.1 highrises building builds through some process.

2.1.1 RC method of construction/SRC method of construction
Terminology explaining
engineering works terminology dictionary - RC method of construction
RC-rapid curning . Speak kind of liquid asphalt that mix high-test gasoline or naphtha on straight asphalt.
RC method of construction - RC sleeper concrete refers to concrete tie that compression is strong but strengthen reinforcing rod to strengthen seal because is weak to seal.

(1) RC method of construction
(2) SRC method of construction

2.1.2 .Tube method of construction

2.1.3 SCF method of construction
2.2 With design of the rough copy layer building the form which is unique

3. Writing of thanks
4. Bibliography

5. Conclusion

본문내용
2. Main discourse
2.1 highrises building builds through some process.

Good new construction method of constructions and systematic construction order are required in plan as building which cause particular condition that is different from universal condition preservation and administration side design and space-time in general building and with use.
In highrise building systematic and basic construction order does basis completion, ironworker pillar establishment, iron frame beam establishment, facing establishment, interior unit New Year, is gone by baseplate establishment, SCF lift up, Choesangbucheung spatial-temporal net Eu.
(figure 2.1) Forward, do to recognize about RC/SRC method of construction, Tube method of construction and SCF method of construction to become basis of highrise construction of them in 2.1.
Fig 6 Flowchart construction space-tim


2.1.1 RC method of construction/SRC method of construction
Terminology explaining
engineering works terminology dictionary - RC method of construction
RC-rapid curning . Speak kind of liquid asphalt that mix high-test gasoline or naphtha on straight asphalt.
RC method of construction - RC sleeper concrete refers to concrete tie that compression is strong but strengthen reinforcing rod to strengthen seal because is weak to seal.
(1) RC method of construction
Fig 7. RC structure.

If define RC method of construction breifly, because rubing cement and sand, gouge the interval and call method of construction to inlay reinforcing rod.
This method of construction that is called alias reinforcing rod Konkeuri Teugongbeop (鐵 筋 Concrete 工法) is used widely in construction of apartment etc.. in domestic by one of quantity zero methods of modern upper floor construction with iron frame (鐵骨) method of construction (alias H beam method of construction).
Cone Keuriteu method of construction is not freted, but iron frame concept added to supplement him because flexure sensitivity (force or elasticity that bear in external force that nod some quality of the material or is curve . = bending strength) is lacking.
Iron frame concrete method of construction is making thereby.

Advantage of RC (Reinforced Concrete) structure is as following.

1) high economic performance
2) because resources expense is inexpensive than steel-frame structure) corrosion resistance that prevent corrosion of interior reinforcing rod because is alkalinity is security
3) have excellent modeling.
4) ability that have high hardness and stand in shock of pedestrian or machine operation etc. is big.

On the other hand, shortcoming is
1) withstand to Apchukryeok, force that press, but is weak in tensility, force that pull.
2) because weight is high than strength, weight of building is heavy.
This is repletion fairly by high-strength concrete and light weight concrete development, use.
3) expense that construction period (term of work) is prolonged and makes mold by use of mold much Deum .