2. Main discourse
2.1 highrises building builds through some process.
Good new construction method of constructions and systematic construction order are required in plan as building which cause particular condition that is different from universal condition preservation and administration side design and space-time in general building and with use.
In highrise building systematic and basic
To understand cost account that we learned in the class and to know how it used in construction site.
The site has inclination . So, the area which resist high pressure use CIP and the area which resist low pressure use H Pile+Timber.
Using the Top-down method, it can excavate both
side at the same time. They don’t need to excavate
next site. Therefore, it could reduce the d
Method of Construction for Injection)
1) 작업 순서
(1) 균열 및 누수 상태 조사
- 구조물의 두께, 균열폭, 균열의 깊이 및
누수 상태를 조사하여 공정순서를 확인한다.
(2) 천공 작업
- 콘크리트 두께가 10cm 이하인 경우 균열부에 직접 천공을 한다. 콘크리트 두께가 10cm~50 <그림1. 균열 및
construct integrated information system by using ERP.
And This makes enterprise’s management system more efficient. So, innovation management is possible through ERP system.
As a result, This effective ERP system improves working process and minimizes leading time.
However, in spite of many strengths, it has also three main weaknesses.
First of all, the most serious weakness is limitation
construction market and the whole of system will be expected many changes, because it enforces reinforcement plan of competition and policy expecting reflationary effects through improving of construction situation.
7. Recognition of revenue and expense; Progress standard (¡êcompleted-contract method; not applying in financial accounting standards.)
▶When - The case that could assume