Project objectives
Configuration of the ground state and Geotechnical
Characterization in project site The most rational and cost-effective foundation design
Location
Gyeonggi, Incheon, Yeonsugu, Songdo-dong 00 Street
Design Range
Ground survey
Laboratory Tests
Soft Ground
Handling Measures
4) Foundation design
● A central settlement of the buil
soil nailing 공법
■ wire frame 공법
비탈면 전체에 철망을 펴놓은 후 종횡 일정한 간격으로 와이어 로프를 포설하여 격자
모양을 형성시켜 서로 교차한 부분에 앵커 볼트를 타입하여 본바닥에 고정시켜놓고 각
와이어 로프에는 코일을 감아서 모르터 뿜어붙이기 또는 콘트리트 뿜어붙이기에 의해
이 코
02 Securing water source for the Four-River Project
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
Ⅱ. Policy Analysis of
4 rivers restoration Project
1. React to climatic change
2. Secure water resources
3. Water improvement
4. illegality of pushing method
5. Economic problems
6. Ecosystem restoration
7. Doubts of the grand canal
8. Damages of cultural assets
JFK
FADE IN:
Credits run in counterpoint through a 7 to 10 minute sequence of
documentary images setting the tone of John F. Kennedys Presidency and
the atmosphere of those tense times, 1960 through 1963. An omniscient
narrators voice marches us through in old time Pathe newsreel fashion.
VOICE
January, 1961 - President Dwight D. Eisenhowers
Farewell Address to the Nation -
EISENHOWER ADDRES