operation etc. is big.
On the other hand, shortcoming is
1) withstand to Apchukryeok, force that press, but is weak in tensility, force that pull.
2) because weight is high than strength, weight of building is heavy.
This is repletion fairly by high-strength concrete and light weight concrete development, use.
3) expense that construction period (term of work) is prolonged and makes mold
condition.
Sixth, by using PM, they can identify excessive maintenance costs of facilities. And PM indicates the need for corrective maintenance, operator training or replacement of obsolete equipment.
Seventh, PM improves safety and quality of facilities conditions. If preventive maintenance program can't reduce costs, this PM program is regarded as not having cost efficiency.
(2) Preventi
oper time. It is hard to find vacant seats in the UCC after class is finished. Once students get the seat in the UCC, they don’t leave their seats because they know there will be no vacant seats if they leave. However, they step out from their seats when they have dinner or break time. During that time, they just leave their bags left on the computer seats so others can’t use those seats. Fig
Calculations of the design of each unit operations
Flowrate
Present Average Flowrate = 4220 m3/d
Water use per capita = 4220/15000 = 0.281333 m3/d capita
Population after 10 years = 15000 Χ 1.0310 = 20158.75 ≒ 21000 capita
∴ Average Flowrate = 0.281333 Χ 21000 = 5908 m3/d ≅6000m3/d
Peak Flowrate = 5908 Χ 1.5 = 8862 m3/d ≅9000 m3/d
Screening
Conditions
Cle
engines operate their business without any kind of censorship?
3.2 Google should not have entered China and engaged in self-censorship.
“Providing some information is better than not providing anything”, claimed by Google, may only be considered a self-defense for giving up its mantra for the possible profit in China. Google’s decision is based on Utilitarian approaches to ethics. Howev