bird species and destroy critical habitat, a conservation group's report said.
The section for canal :
[Gyeongbu Canal]
: Connection between Moon-kyung and Chung-ju
[Honam Canal]
: Connection between Young-san river and Kum-river
[North Korea Canal]
: Connection between North rivers and Han-river
Total length : 553km
Goal of Canal : environmentally friendly
ORIGINALLY, IT WAS USED TO BE NANJIDO LANDFILL
ONE OF CITY’S MOST ECO-FRIENDLY PARK
USING ECO-FRIENDLY ENERGY TO OPERATE
October 2009, Seoul Dream Forest opened.
Dream Forest in Gangbuk-gu is the newest addition to Seoul’s growing list of green spaces.
well-designed space with woods, ponds, cafes, restaurants, galleries, an art center.
02 Securing water source for the Four-River Project
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
Ⅱ. Policy Analysis of
4 rivers restoration Project
1. React to climatic change
2. Secure water resources
3. Water improvement
4. illegality of pushing method
5. Economic problems
6. Ecosystem restoration
7. Doubts of the grand canal
8. Damages of cultural assets
Air pollution Cost for road transportation is 3,067 won/TEU-km??
ONLY 200 won/TEU-km!!
What about CO2 Exhaustion?
85.9 g / ton km >35.6 g / ton km
It is necessary to reduce greenhouse gas exhaustion quantity due to Kyoto protocol.
Canal transportation exhausts much less gas compared to that of road transportation.