2. Main discourse
2.1 highrises building builds through some process.
Good new construction method of constructions and systematic construction order are required in plan as building which cause particular condition that is different from universal condition preservation and administration side design and space-time in general building and with use.
In highrise building systematic and basic
build at high and steep mountains, and the length of the walls stacking stone is 5.7km. Also he was built dirt in the plains. Mud-plastered wall’s scale is 7.5M in width from lower part, 5.4M in width from upper part, 7.5M in height. And the length of the walls is 12.9KM.
○3Introduction of 4 Big Gates & 4 Small Gates
Castle is connected to the mountains surrounding Hanyang. Castle of
of paper is inserted and a new text or a new drawing is created.
In 3D printing, after the first layer has been completed, either the vertical position of the nozzle is raised at least 0.1mm (0.004 inch), which is equal to the thickness of good quality paper, or the supporting table is lowered an equivalent amount, and the process is repeated. In order to build an object the controlling drawing
of persons to be admitted
- 5760 person
1) Exhibition Halls
- Size of 3 soccer fields, The only 'one story pillar free' exhibition hall in Korea (possible installation of approximately 1,800 booths)
- Maximum floor load of 5 ton and ceiling heightof 22.5m
- Trench boxes with high-tech equipments installed every 9 meters on all 4 sides
- Various exhibition
of high-density public transportation services that can be provided
2)placing Station Residential, commercial, workplace, public facilities such as parks
within Walking Distance
3) configuring pedestrian-friendly street network
4) mixed arranging housing of type, density, cost
5) providing Quality of the natural environment and open space
6) making Public space center ofbuilding arran