the other hand, shortcoming is
1) withstand to Apchukryeok, force that press, but is weak in tensility, force that pull.
2) because weight is high than strength, weight of building is heavy.
This is repletion fairly by high-strength concrete and light weight concrete development, use.
3) expense that construction period (term of work) is prolonged and makes mold by use of mold much Deum .
What is a GSCM?
Integrating Environmental Thinking into Supply Chain Management, including
Product design
Material sourcing and selection
Manufacturing processes
Delivery of the final product to the customers
End-of-life management of the product after its useful life
Energy-saving facility investment tax deduction
Deduct 10% of corporate tax when local company invest in energy-sav
(1) 물적유통관리상의 Total Cost의 절감
(가) 수송 및 하역비 절감 : 컨테이너 수송시에 적용되는 품목별 무차별운송(freight all kinds)의 적용에 따른 비용절감과, 공장으로부터 본선인도에 이르기까지 샤시(chassis)에 의한 일관수송이 가능하여 대폭적인 비용절감이 가능하다. 특히 적재와 양륙시 화물의 기
Posco was established a 포항종합제철㈜ at 1968
And in 2000 the Posco was privatized
Now posco has a 포항제철소 and 광양제철소
It makes Posco best company of the world
50 one million tons of steel building systems, globalAll products of high quality steel fixation system
Two processing are done before the continuous casti