1. 구조 문제
3초 안에 해결되는, 구조(품사) 문제 총정리
명사가 들어가야 할 자리를 비워놓은 문제유형
형용사가 들어가야 할 자리를 비워놓은 문제유형
부사가 들어가야 할 자리를 비워놓은 문제유형
수일치에 주의해야 하는 문제유형
2. 문법 문제
‐ 자주 출제되는 문법 총정리
01 상
Capacity & Problem Analysis
I. Capacity Analysis
RP1 was highly mechanized. The process could be classified into several operations : receiving and testing, dumping, temporary holding, destoning, dechaffing, drying, separation, and bulking and bagging. We found major bottleneck on the dryers through NCC flowchart.
First, Bulk trucks carrying process berries arrived at RP1, loading 20
1) INTRODUCTION
The National Cranberry Cooperative case present the production and operation problems faced by plant processing berries in the USA, in the seventies.
- PRESENTATION OF NCC & THE CRANBERRY INDUSTRY
As volume of the harvested berries increased, problems arose in the transformation of those berries into saleable products. This was the case in NCC’s receiving plant n°1 (RP1).
Summary and creative answers to Toyota Motor Manufacturing, U.S.A., Inc.
BACKGROUND Toyota invested up to 800 million dollars in Kentucky and made Toyota into a multinational corporate company. But Toyota very concerned about the reputation of high quality at low cost. Toyota tried to transplant its unique production system to Bluegrass Country effectively. In this way Toyota could increase
II. Temporary Holding
After the process berries were weighted, sampled and finally color graded, they were finally moved to one of the five Kiwanee dumpers which had rapidly moving belt conveyors. The berries were taken to one of the 27 temporary holding bins (bins 1-24 held 250 bbls. and bins 25-27 held 400 bbls. each) which were controlled from a central control panel. Although it usually took