Ⅱ. Policy Analysis of
4 rivers restoration Project
1. React to climatic change
2. Secure water resources
3. Water improvement
4. illegality of pushing method
5. Economic problems
6. Ecosystem restoration
7. Doubts of the grand canal
8. Damages of cultural assets
2.3 Methods used for restoration
Firstly, a water purification system using gravel contact oxidation process was installed to clean the water. The system located in Young-dong 2 gyo was the first to utilize the gravel contact oxidation process in Korea. It uses a media like gravel and artificially maximize the natural purification process like precipitation, absorption and decomposition by
02 Securing water source for the Four-River Project
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
1. Introduction of the project
1) Purpose of project
Through the project, we want to build extensive knowledge about cruise industry and accounting analysis (common size analysis, comparative analysis, and ratio analysis). We believe that the project makes us accounting experts.
Cruise Industry has grown and continues to grow enormously in scale. It is frequently regarded as a small but sig
2. Project Information
2.1 Properties of Namhangjin Coast
Spring Range
16.8cm
Mean Range
13.2cm
Neap Range
9.6cm
Mean Monthly-Highest Water Level
44.6cm
= Approx. H.H.W
+ (H.W.L-Approx. H.H.W.)