Ⅱ. Policy Analysis of
4 rivers restoration Project
1. React to climatic change
2. Secure water resources
3. Water improvement
4. illegality of pushing method
5. Economic problems
6. Ecosystem restoration
7. Doubts of the grand canal
8. Damages of cultural assets
the cost due to corruption should be borne by the people through the tax, and the duration of the impact may be long-lasting. Considering Nuclear Power Plant Components Test Report forgery, redevelopment project, the corruption in the Railways Corporation parts supply, the Four Rivers Project, it can be seen that public corruption appears in various areas and people have to bear the burden.
02 Securing water source for the Four-RiverProject
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
improvement. This is because airlines industry is a mixture of many hospitality fields such as service science(Online booking system, Aircraft technology, IT system for serving customers ), service marketing for ticket sales like hotel industry and food-service industry. For these reasons, we chose airline industry and AMR Corporation and US Airways airlines.
AMR Corporation and US Airways are
II. How is CBM formed
Coalbed methane (CH4) forms in one of two ways. During the earliest stage of coalification (the process that turns plant detritus into coal), biogenic methane is generated as a by-product of bacterial respiration. Aerobic bacteria (those that use oxygen in respiration) first metabolize any free oxygen left in the plant remains and the surrounding sediments. In fresh water