Brazilian Indians ride a bus to protest a
proposed hydroelectric dam on Xingu River.
Indigenous women, bearing machetes,
Protest against the construction of the Belo
Monte dam.
400 km2 of agricultural land will be flooded
Permanent drought on the Xingu River
Over 20,000 people will be relocated
During its first 10 years of operation
Belo Monte
02 Securing water source for the Four-River Project
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
dam.
BALD MAN: Those are the rules, Max.
You can always use the overtime.
MAX: I suppose so.
[Starts engine]
BALD MAN: Is everything OK? MAX: Yeah.
BALD MAN: You check the base. Ill look down below.
[Machinery whirring]
MAN ON RADIO: At : a.m.,
a earthquake registering . on the Richter scale...
was felt in Los Angeles.
No injuries were reported. Minimal property damage...
DIFFERENT MAN ON RADIO:
Ⅱ. Policy Analysis of
4 rivers restoration Project
1. React to climatic change
2. Secure water resources
3. Water improvement
4. illegality of pushing method
5. Economic problems
6. Ecosystem restoration
7. Doubts of the grand canal
8. Damages of cultural assets