2. Analysis of project
1) Course of pipeline from knock-out drum on the first floor to storage tank on the third floor.
It is ideal to design pipelines using straight line for economic feasibility and efficiency but that is impossible for the reason of structure of plant. So It is necessary to inspect the structure of plant.
2) What kinds of pipe do we decide?
Considering economi
drums and bond. Get a shrink.
Hug a friend. Hug yourself.
He stops, realizing that everyone in the room is staring
at him. Quickly they pretend they werent paying
attention. Someone whispers something to a client.
SAM
(continued)
Dont mind him. Hes the guy
who just lost his wife.
(beat)
What I really think is we need
a change.
ROB
Good idea. Take a few weeks
off, get some sun, take Jonah
f
drummer
Kill the bass player
Kill both bass players
This song is the reason
why Im now going deaf
Lets kick some ass ! Yeah !
I feel good today, Silent Bob.
Were gonna make some money.
And you know what were gonna do ?
Were gonna go to that party
and get some pussy.
Im gonna fuck this bitch,
Im gonna fuck this bitch.
Ill fuck anything that moves !
What the fuck you lookin at ?
Ill kick your fu
installation.
Im nearly done.
Ooh, Ill be wired up to the world soon, me... in touch with all parts.
- Nearly done. - Goodley.
I spend me life and me fortune in them slot boxes. Really, I do.
Ooh, but them uniforms are not very becomin.
You look like you been chucked in a tool bag, you.
Put me right off, that has.
And I always liked a man in a uniform, me.
- Oh, I bet you did. - Hey, watch it, sp
A top-secret, experimental, offensive/defensive military installation hidden away in the countryside outside Philadelphia, Pennsylvania.
CLOSE on a beautiful, intricate, state of the art computer panel as it is lifted out of a large console. A huge, dimly lit display board, sporting a galaxy of small running lights, looms above.
The panels removal creates a large, vulnerable opening, inside of wh