estimated that occurred two days after the festive period by calculating the
maintenance costs and revenue
a) Investment costs & Target figure
25 Students pay equally 30,000won
25 people * 30,000 won = 750,000 won
→ Target price was calculated after Setting as the investment
Collecting the views of staff and other costs resulting
□ Traditional approach to Industrial location (공업지역에 대한 전통적 접근방식)
▶ focused on the proximity of raw materials and markets,
mainly with a view to minimizing transportation cost
(운송비 최소화의 관점에서 원자재와 시장에 대한 접근성에 관심)
□ The integrated feasibility study (통합 타당성 검토)
▶ Technically feasible (기술
Ⅱ. Analysis & Valuation process
Cost of Equity
The cost of equity is a key ingredient of every discounted cash flow model. It is difficult to estimate because it is an implicit cost and can vary widely across different investors in the same company.
① Risk Free Rate
There can be no default risk, which generally implies that the security has to be issued by a government. Note, though,
construction and educational facilities about operation and maintenance are recognized the significance after taking place disaster. Most universities in Korea have unplanned and reactive characteristic and in an extension of the problem statement, If reactive FM is lasting, operation and maintain cost of school building will increase.
Especially, Korea Universities are lacking in recognition of
- The directors voted to establish a subsidiary in Thailand
- Its initial estimates = 550 million Thai Baht(TB)
= $ 12.65 million (∵ spot rate = $0.023/TB)
- Now Blades has $2.65 million available
- The remaining $10 million (=TB434,782,609) should be obtained from other sources
- CFO prefers 'debt' to equity financing to raise the funds since Blades is a