02 Securing water source for the Four-River Project
Water procuring plan for 4 rivers masterplan
Dredge and irrigation installment 800 million(㎥)
Middle/small dam construction 250 million(㎥)
Raising agricultural reservoir 250 million(㎥)
Planning to secure total of 1.3 billion㎥
After 4 rivers business construction
Dredge and irrigation install
deprive initiative from depending company.
Firstly, I explain about why LG electronics introduce ERP system.
In past, LG CEO realize that not only inventories but also production cost and processing time is increased.
So they decided to change their whole system. This project is called Win project.
And as a part of Win project, LG introduce ERP system which is controlled by ORACLE.
1. Introduction of the project
1) Purpose of project
Through the project, we want to build extensive knowledge about cruise industry and accounting analysis (common size analysis, comparative analysis, and ratio analysis). We believe that the project makes us accounting experts.
Cruise Industry has grown and continues to grow enormously in scale. It is frequently regarded as a small but sig
Project Overview
- Total Goal
To research about Zen Backpackers on/offline to complete the report and presentation slides for the final documented report and presentation in class
- Specific Goal and Method
1) To arrange meetings every Tuesday and Wednesday before the class
2) To manage our own online community on Cyworld; it makes the members connected with each other
3) To interview peo
1. Topic
This time we are going to research the safety management and improvement in small scale one room construction. According to the current situation we need to reduce our research scope. So we are focusing in the vicinity of Kyunghee Univ. and Hankuk Univ. of Foreign Studies.
2. Problem statement
2-1. Construction’s needs and industrial accident
2-1-1.
New one-room construct