constructions and systematic construction order are required in plan as building which cause particular condition that is different from universal condition preservation and administration side design and space-time in general building and with use.
In highrise building systematic and basic construction order does basis completion, ironworker pillar establishment, iron frame beam establishment,
construction work)이 수행된다.
기본계획은 기능계획(functional planning)을 제1단계로 시작해서 제3단계는 물리계획(physical planning), 제3단계로서 공정계획(construction work planning) 그리고 마지막으로 제4단계로서 투자계획(investment program)을 수립함으로써 완성하다.
구조계획은 먼저 프로젝트의 규모와 성격에 따
1. Topic
This time we are going to research the safety management and improvement in small scale one room construction. According to the current situation we need to reduce our research scope. So we are focusing in the vicinity of Kyunghee Univ. and Hankuk Univ. of Foreign Studies.
2. Problem statement
2-1. Construction’s needs and industrial accident
2-1-1.
New one-room construct
실천적인 조직문화의 구축이 필요했다. 이를 위해 회사는 세계 초일류 기업인 GE에서 자발적이고 실천적인 조직문화를 정착시키는데 핵심적인 역할을 한 Work out 프로그램을 기반으로 하는 Winning Meeting을 도입하기로 하고 지난 2006년 4월 24일에 WM선포식을 실시한 이후 전사적으로 확대하고 있다.
construct integrated information system by using ERP.
And This makes enterprise’s management system more efficient. So, innovation management is possible through ERP system.
As a result, This effective ERP system improves working process and minimizes leading time.
However, in spite of many strengths, it has also three main weaknesses.
First of all, the most serious weakness is limitation