Subject of the Research
Conduct research on international students’ satisfaction with international exchange programof Kyonggi University
Object of the Research
111 International students who are studying at Kyonggi and Ajou University institute for international education
Beginning of the Research
We would like to study about the quality of Kyounggi University institute for
program can save the energy by making sure that comfort systems of automated building are operated properly. Mc Graw said that Using of PM program minimizes energy consumption (5% less)
(4) Preventive Maintenance can improve the experience of building occupants.
If a PM program is established, FM'er can find and solve the problem, before user find it. So PM can improve the satisfaction level o
of its members. Producers do agree with the vision and have the desire to make programs which actualize the visions, just like producer Young-hee Kim did when he produced programs ‘Conscious Refrigerators’ and ‘!’. These internal desires to realize the corporate vision have the potential to be translated into action if the safety needs of the producers are satisfied. Without the satisfact
towards goal achievement. 86.7% of the employees said they felt they were trained appropriately for their position. However, only 68% were satisfied with the link between learning opportunities and future career paths.
Analysis of The Body Shop’s Strategic Stakeholder Management System
The Body Shop’s Value
The soul of beauty
To The Body Shop, beauty is a feeling, a natural way of
of the organization
- Bring all employees into the decision making process
- Trust people and their ability to contribute to the mission
- Place emphasis on prevention and problem solving work
- Treat each other with dignity and respect
2) Do they have long term vision?
① Evaluation
Evaluation(I ): very good ( v) good ( ) average ( ) bad ( ) very bad ( )
Evaluation(E): very