크랜베리 National Cranberry Cooperative 사례

 1  크랜베리 National Cranberry Cooperative 사례-1
 2  크랜베리 National Cranberry Cooperative 사례-2
 3  크랜베리 National Cranberry Cooperative 사례-3
 4  크랜베리 National Cranberry Cooperative 사례-4
 5  크랜베리 National Cranberry Cooperative 사례-5
 6  크랜베리 National Cranberry Cooperative 사례-6
 7  크랜베리 National Cranberry Cooperative 사례-7
 8  크랜베리 National Cranberry Cooperative 사례-8
※ 미리보기 이미지는 최대 20페이지까지만 지원합니다.
  • 분야
  • 등록일
  • 페이지/형식
  • 구매가격
  • 적립금
자료 다운로드  네이버 로그인
소개글
크랜베리 National Cranberry Cooperative 사례에 대한 자료입니다.
목차
1. Summary


2. Analysis and short-term solution


3. Long-term solution

본문내용
1. Summary

On February 14, 1971, Hugo Schaeffer, vice president of operations at the NCC, revealed his concern that although the company had spent $75,000 on a fifth Kiwanee dumper, overtime costs were still out of control and the growers were upset that their trucks and drivers had to spend so much time waiting to unload. The superintendent, Walliston, thinks that in order to avoid the problem, NCC should buy and install two new dryers and convert the dry berry holding bins so that they can store either water-harvested or dry berries.
NCC was an organization formed and owned by growers of cranberries to process and market their berries.
A trend of cranberry harvest was the growing surplus of cranberries produced over those utilized. Another important trend was the increasing mechanization of cranberry harvesting and could result in yields up to 20% greater than those obtained via dry harvesting. However, water-harvested berries should be shipped in box that contain only 1/3 bbl of berries because of the risk of damage and it also shorten the time berries stay in fresh.
오늘 본 자료
더보기
  • 오늘 본 자료가 없습니다.
해당 정보 및 게시물의 저작권과 기타 법적 책임은 자료 등록자에게 있습니다. 위 정보 및 게시물 내용의 불법적 이용,무단 전재·배포는 금지되어 있습니다. 저작권침해, 명예훼손 등 분쟁요소 발견 시 고객센터에 신고해 주시기 바랍니다.