Dongyoung Cold Plaza
-Size : 1,500-pyeong
Factory facilities
-80,000tons of
refrigerating facilities
-12,000-ton cold store
☞Capable of processing
up to 50 tons/year
Total Time = 160 sec
About 100 tuna cans can be produced
per tuna
→ Assume a whole tuna as a unit
Total Time = 160 seconds
The factory is operated 10 hours/day
418 tunas/day to meet the demand forecast
Cycle Time = Production Time/day
Required output/day
= 60sec * 600 min
418 tunas
= 86.12 sec
N = Sum of task time (T)
Cycle time (C)
= 160sec
86.12sec
= 1.8
≒ 2 stations
Efficiency
= Sum of task time
Actual # of workstation * Cycle time
= 160 / 2*86.12
=92.89%
Delivery Service
Decrease distribution cost
Maximize delivery effectiveness
Minimize delivery time
Distributing & Manufacturing
Service
Manages productivity
Stickers/tags on the finished
imported goods
Transport Service
Developed advanced transportation system
through the best quality trucks
Distribution Consulting Service
Constructed DW’s Centroid
Established efficiency in distribution
management operation
Central Operation Service
Manages inventory service system
Controls temperature for storage & delivery trucks
Supervise warehouse & shipment