[생산운영관리] Hank Kolb, Director of Quality Assurance

 1  [생산운영관리] Hank Kolb, Director of Quality Assurance-1
 2  [생산운영관리] Hank Kolb, Director of Quality Assurance-2
 3  [생산운영관리] Hank Kolb, Director of Quality Assurance-3
 4  [생산운영관리] Hank Kolb, Director of Quality Assurance-4
 5  [생산운영관리] Hank Kolb, Director of Quality Assurance-5
 6  [생산운영관리] Hank Kolb, Director of Quality Assurance-6
 7  [생산운영관리] Hank Kolb, Director of Quality Assurance-7
 8  [생산운영관리] Hank Kolb, Director of Quality Assurance-8
 9  [생산운영관리] Hank Kolb, Director of Quality Assurance-9
 10  [생산운영관리] Hank Kolb, Director of Quality Assurance-10
 11  [생산운영관리] Hank Kolb, Director of Quality Assurance-11
 12  [생산운영관리] Hank Kolb, Director of Quality Assurance-12
 13  [생산운영관리] Hank Kolb, Director of Quality Assurance-13
 14  [생산운영관리] Hank Kolb, Director of Quality Assurance-14
 15  [생산운영관리] Hank Kolb, Director of Quality Assurance-15
 16  [생산운영관리] Hank Kolb, Director of Quality Assurance-16
 17  [생산운영관리] Hank Kolb, Director of Quality Assurance-17
 18  [생산운영관리] Hank Kolb, Director of Quality Assurance-18
 19  [생산운영관리] Hank Kolb, Director of Quality Assurance-19
 20  [생산운영관리] Hank Kolb, Director of Quality Assurance-20
※ 미리보기 이미지는 최대 20페이지까지만 지원합니다.
  • 분야
  • 등록일
  • 페이지/형식
  • 구매가격
  • 적립금
자료 다운로드  네이버 로그인
소개글
[생산운영관리] Hank Kolb, Director of Quality Assurance에 대한 자료입니다.
목차
1.Define the problem
2.Theory of the Quality management
3.Case study
- Construction siete
3M, LGE, LS Mtron
4. Conclusion
본문내용
Personnel

The operator had just be transferred in without any formal training.
The operator was not around when he was supposed to be.

Plant Maintenance

There was no scheduled or preventive maintenance.
Nonstandard downtime; 15% of actual running time.

Purchasing

The plastic nozzles were a rush order.
It caused a vendor to do careless design with several defects.

What is Quality Management?

Definition
Determining quality policies, objectives, and responsibilities
so that project will satisfy the needs for which it is undertaken.

Purpose
To ensure that the project outputs are delivered fit-for-purpose..

Process
- developing quality criteria for the outputs themselves
- ensuring that all project management processes are conducted in a quality manner.
오늘 본 자료
더보기
  • 오늘 본 자료가 없습니다.
해당 정보 및 게시물의 저작권과 기타 법적 책임은 자료 등록자에게 있습니다. 위 정보 및 게시물 내용의 불법적 이용,무단 전재·배포는 금지되어 있습니다. 저작권침해, 명예훼손 등 분쟁요소 발견 시 고객센터에 신고해 주시기 바랍니다.