규칙성 여부에 따라 크게 고정비율계획(FR), 변동비율계획(VR), 고정간격계획(FI), 변동간격계획(VI)으로 4가지 유형을 제시하였다...<중략>
① 고정간격계획(fixed-interval schedule)
② 변동간격계획(variable-interval schedule)
③ 고정비율계획(fixed-ratio schedule)
④ 변동비율계획(variable-ratio schedule)
참고문헌
Based on the data we found on the annual report and detailed product report of the company, we found out that a person can assemble 13 big LCDs in a day if they work for 10 hours. Therefore, from 13/10 we get 1.3 LCD per hour, and in order to fix this into labor hours per assembly, we divided 1 with 1.3 and got 0.77.
Labor hours per testing: 0.5
Since Labor hours for testing was recor
2.3 C-V graph
The measured MOS capacitance (called gate capacitance) varies with the applied gate voltage.
① Measurement of C-V characteristics
-Apply any DC bias, and superimpose a small (15 mV) ac signal
-Generally measured at 1 MHz (high frequency) or at variable frequencies between 1KHz to 1 MHz
-The dc bias VG is slowly varied to get quasi-continuous C-V characteristics
② C-V chara
2. What business risks does Blue Nile face that may threaten its ability to satisfy stockholder expectations? What are some examples of control activities that the company could use to reduce these risks? Are some of the risks faced by Blue Nile difficult to reduce through control activities? Explain.
There are so many risk factors for Blue Nile, but main risk factors a